x
uploads/dewater.jpg

dewater vt.使脫水,使濃縮。

dewax

In view of geological and hydro - geological situations of the south anchor runyang yangtze river highway bridge , the paper bring forward mathematical model and calculation method of double deck structure groundwater , which can be used to lively calculate every layer ' s water table , so that we can realize every layer ' s settlement calculation and control ; establish the inter relationship between non - linear physical - mechanics parameter and hydro - geological parameter , objectively describe the non - linear change process of the porosity , hydraulic conductivity , specific storativity in the process of soil dewater and concretion 針對潤揚長江公路大橋南錨場地地質、水文地質條件提出了雙層結構地下水運動的數學模型和計算方法,該方法可以實時計算出各分層的地下水位,實現了各分層沉降計算與控制研究;建立了土層非線性物理力學參數與水文地質參數之間的內在聯系,客觀地描述土層降水? ?固結過程中孔隙度、滲透系數和貯水率等參數非線性變化過程。

The dewater calculation result of the south anchor of runyang yangtze river highway bridge ' s shows that the double deck structure model provide a new method to the non linear coupling calculation of deep foundation pit dewater and settlement , forecast and control the distortion of the soil in the pit , engineering construction and design 潤揚長江公路大橋南錨基坑工程降水計算表明,雙層結構模型為深基坑降水與沉降的非線性耦合計算,基坑土體變形預測、控制,工程施工和設計提供了新的計算分析途經。

Flying fish automatic industrial washing machinery series can wash , bleach dewater at medium or high speed , etc . the whole process is automatically controlled with micro computer , and some steps also can be operated manually 飛魚系列全自動工業洗衣機,即洗、脫兩用機,具有洗滌、漂洗、均布、中脫、高脫等功能,采用微電腦進行全過程的自動化控制,也可對各步驟進行手動操作。

Energy needed to dewater sewage sludge can be provided from within the process thus providing a composite solution for a wide variety of waste related problems and disposal requirements 此處理方法可以提供污水污泥進行脫水所需要的能量,因此為各種垃圾的相關問題和處理要求提供了合成解決方案。

The coalescence & separation filter core , targeting at low viscosity oils , is highly efficient to dewater according to the difference of different material ' s surface tension 針對低粘度油液的特殊配比的聚結分離濾芯,根據介質表面張力的不同進行細化分離,脫水效率高,脫水能力強。

To stop the machine , shut off the cooling fluid first and let the grinding wheel revolve 2 - 3 minutes to dewater , then stop the wheel 工作完畢停車時,應先關閉冷卻液,讓砂輪運轉2 - 3分鐘,進行脫水,方可停車。

For improve site soil condition and ensure piling work safety , we have worked out dewater construction proposal 為改善現場施工的場地條件,保證壓樁工程的安全進行,編制降水工程的施工方案

Dyq thicken dewater integrated package 污泥濃縮一體機

Automatic control of slurry dewater system 污泥脫水系統的自動化控制

Study on effect of magnetic treatment on sludge dewater ability 磁場對污泥脫水性能影響研究

Plate frame filter filterbelt press thicken dewater filter 廂式板框壓濾機