x
uploads/banking power.jpg

banking power 貸出能力。

banking reserve

Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station , the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers 由于三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。

Abb china chairman and president peter leupp announced yesterday the company has won contracts worth around us 60 million to supply a large 500 kv gas - insulated switchgear and 12 sets of power transformers for the right - bank power plant of the three gorges dam project 這次客車企業能首先榮膺汽車行業的“中國名牌” ,也是和客車企業長期以來特別重視品牌建設,打造名牌意識強烈分不開的。他們中的很多企業甚至已經喊出了要爭國際名牌的聲音。

The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework 三峽船閘高邊坡,因地應力釋放、滲流條件變化和巖石徐變,使巖坡產生緩慢位移,改變了人字門的支承條件,從而影響到人字門的正常工作。

The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework 三峽工程左岸電站水輪發電機中性點接地方式的選擇應和發電機100 %范圍定子一點接地保護相關聯。